EngineeredBoundaries.Installed Once.
High-tensile mesh, electrified palisade, and razor wire systems for logistics parks, schools, and estate developers who need boundaries that hold.
The Right Barrier
for Every Threat.
Three product families. Each spec'd for a specific risk profile, installed with the same attention to weld integrity and post alignment.

ClearVu Mesh
Welded 76.2 × 12.7 mm apertures deny finger and toe holds. Powder-coated in RAL 6005 moss green for school applications or RAL 7016 anthracite for estates. Each panel carries a 10-year coating warranty.

Palisade Fencing
Hot-rolled steel pales spaced 100 mm apart with twisted top profiles. Integrated electric fence energiser mounting brackets are factory-welded. Galvanised and painted to C5-M corrosion category.

Razor Wire Topping
Concertina coils formed from 0.5 mm galvanised steel tape with razor-sharp barbed clips at 33 mm intervals. Supplied in 450 mm, 730 mm, and 960 mm coil diameters. Complies with SANS 1651.
Every Site Type.
One Contractor.
From school bursars to government tender panels — our installation documentation satisfies every compliance requirement.

School Boundaries
Replacing aging palisade with 358 ClearVu mesh. Compliant with SANS 10400-T occupancy requirements. Minimal visual obstruction for perimeter CCTV.

Logistics Parks
Electrified palisade with integrated energiser ducting, CCTV post mounts, and vehicle-rated gate systems for bonded warehouse compliance.

Estate Developers
SANS-compliant boundary walls with ClearVu infill panels and automated boom gates. Occupation certificate ready.

High-Security Facilities
Dual-layer razor wire topping on reinforced palisade. Tamper-evident hardware, anti-dig skirts, and full installation documentation for tender compliance.
Every Weld Tells You
We Don't Come Back.
Professional installation is visible at 50mm, not 50m. These are the details that separate a 10-year boundary from a 10-month one.




Book Your
Site Survey.
We assess your perimeter, identify risk zones, and deliver a SANS-compliant specification within 48 hours. No obligation.
Survey Request
What Happens Next
Download Spec Sheet
Full product specifications, wire gauges, panel heights, and coating standards. PDF, 2.4 MB.